Earlier this summer, Pioneering Spirit completed the decommissioning of Repsol Norge’s immense Gyda platform. In a matter of days, the world’s most advanced offshore vessel removed the platform’s 18,400-tonne topsides and 11,500-tonne supporting jacket and delivered the structures to a yard in Norway for recycling.

WATCH: Allseas Pioneering Spirit completes 30,000-tonne Gyda platform removal

Project specials

The Gyda removal campaign had some special characteristics. At 11,500 tonne, the jacket lift is one of the heaviest in history. Vertically fabricated and installed back in the early nineties, the structure could not sustain loading in the horizontal position during transport. Our unique Jacket lift system offered a solution: transporting the jacket in a near-vertical positon (60 degrees) and direct load-in to the quayside.

Total lift solution

Deploying both revolutionary single lift systems, the Jacket lift system and Topsides lift system, Pioneering Spirit  offers a significantly faster, safer, more efficient and sustainable option for the removal and installation of offshore facilities.